A property owner was left with two adjoining commercial factory units that had been converted into a sophisticated clandestine cannabis grow operation.
The site contained 12 grow houses, extensive hydroponic watering and lighting systems, altered electrical infrastructure, large volumes of water and growing material, and more than 50 heavy-duty extraction fans and silencers.
The operation also included approximately 90 halogen grow lights and controllers, 48 timing boxes and five substantial timber structures built inside the factory units.
The property could not simply be repaired or re-leased until the operation had been safely dismantled and the site remediated.
Contam Solutions first prepared the Safe Work Method Statement (SWMS) and completed a site safety assessment to determine how the make-safe, rubbish removal, dismantling and remediation works could be undertaken safely.
Once the work method and site controls were established, Contam removed standing water and organic material, engaged specialist demolition and commercial waste contractors, dismantled the grow-house infrastructure and completed the remediation works.
| Property | Two adjoining commercial factory units |
| Grow operation | 12 grow houses |
| Lighting | Approx. 90 halogen grow lights and controllers |
| Timing equipment | 48 timing boxes |
| Internal structures | 5 substantial timber-built structures |
| Extraction equipment | 50+ heavy-duty fans and silencers |
| Waste removed | Approx. 60 m³ |
| Water removed | Approx. 950 litres |
| Contam team | 5 staff |
| Specialist support | Demolition and commercial waste contractors |
| Project duration | Approx. 5 days |
Review the project, prepare the SWMS and complete the site-specific safety assessment.
Make the site safe before removal works begin.
Remove standing water, organic material and residual grow-house contents.
Engage specialist demolition and commercial waste contractors to assist with the strip-out and waste removal.
Remove suspended extraction equipment, grow-house structures and associated hydroponic infrastructure.
Segregate, load and remove approximately 60 m³ of project waste, along with approximately 950 litres of standing water from the grow operation.
Complete the final remediation clean and hand the site back ready for repair and reinstatement.
A five-person Contam Solutions team ran the project on site, from the site safety assessment through to handover.
Specialist demolition and commercial waste contractors worked alongside Contam throughout the strip-out and waste removal.
The grow operation and associated infrastructure were removed, the affected areas were remediated, and the two factory units were handed back ready for repair and reinstatement before returning to commercial use.

Scale of the grow-house setup.

Removal, dismantling and extraction equipment

Cleared and remediated factory space.
Speak with our team about your property remediation requirements and the next steps.