Clandestine Cannabis Grow House Remediation

Two commercial factory units cleared, remediated and ready for repair.

Project Summary

A property owner was left with two adjoining commercial factory units that had been converted into a sophisticated clandestine cannabis grow operation. 

The site contained 12 grow houses, extensive hydroponic watering and lighting systems, altered electrical infrastructure, large volumes of water and growing material, and more than 50 heavy-duty extraction fans and silencers. 

The operation also included approximately 90 halogen grow lights and controllers, 48 timing boxes and five substantial timber structures built inside the factory units. 

The property could not simply be repaired or re-leased until the operation had been safely dismantled and the site remediated. 

What Contam Did

Contam Solutions first prepared the Safe Work Method Statement (SWMS) and completed a site safety assessment to determine how the make-safe, rubbish removal, dismantling and remediation works could be undertaken safely. 

Once the work method and site controls were established, Contam removed standing water and organic material, engaged specialist demolition and commercial waste contractors, dismantled the grow-house infrastructure and completed the remediation works.

Key Project Facts

Property Two adjoining commercial factory units
Grow operation 12 grow houses
Lighting Approx. 90 halogen grow lights and controllers
Timing equipment 48 timing boxes
Internal structures 5 substantial timber-built structures
Extraction equipment 50+ heavy-duty fans and silencers
Waste removed Approx. 60 m³
Water removed Approx. 950 litres
Contam team 5 staff
Specialist support Demolition and commercial waste contractors
Project duration Approx. 5 days

Key Project Facts

01
Step 01

Review the project, prepare the SWMS and complete the site-specific safety assessment.

02
Step 02

Make the site safe before removal works begin.

03
Step 03

Remove standing water, organic material and residual grow-house contents.

04
Step 04

Engage specialist demolition and commercial waste contractors to assist with the strip-out and waste removal.

05
Step 05

Remove suspended extraction equipment, grow-house structures and associated hydroponic infrastructure.

06
Step 06

Segregate, load and remove approximately 60 m³ of project waste, along with approximately 950 litres of standing water from the grow operation.

07
Step 07

Complete the final remediation clean and hand the site back ready for repair and reinstatement.

How We Ran This Project

Our own team on site.

A five-person Contam Solutions team ran the project on site, from the site safety assessment through to handover.

Specialist contractors alongside our team.

Specialist demolition and commercial waste contractors worked alongside Contam throughout the strip-out and waste removal.

Outcome

The grow operation and associated infrastructure were removed, the affected areas were remediated, and the two factory units were handed back ready for repair and reinstatement before returning to commercial use.

Project Photos

BEFORE

Scale of the grow-house setup.

Screenshot_32

DURING

Removal, dismantling and extraction equipment

Screenshot_33

AFTER

Cleared and remediated factory space.

Related Services

Contact Contam Solutions

Speak with our team about your property remediation requirements and the next steps.